Tools: A monte carlo simulation model of the problem was developed for in depth analysis of the following information:
When capacity is reached for each type of development and manufacturing asset.
- With and without increased regulatory requirements
Multiple scenarios of future pipeline products and facilities.
EVA (cost) and risk analysis for each scenario.
- Capital Cash Flow, Operating Expense, Speed to Market Risk